Lorem lorem
Lorem lorem
Lorem lorem
AREAS OF EXPERTISE
Constant
On duty
Maintenance
Deactive
Abdülhamid Han
-
Platform Type & Class7th Generation Ultra-Deepwater Drilling Platform
-
Year Build / Design Place2022 Daewoo DSME12000
-
Max. Water&Drilling Depth3.500 m - 12.000 m
-
Managed Pressure Drilling (MPD) SystemMPD-Infrastructure
Fatih
-
Platform Type & Class6th Generation Ultra-Deepwater Drilling Platform
-
Year Build / Design Place2011, Hyundai, Gusto P10000
-
Max. Water&Drilling Depth3.000 m - 12.000 m
-
Managed Pressure Drilling (MPD) SystemMPD-Installed
Yavuz
-
Platform Type & Class6th Generation Ultra-Deepwater Drilling Platform
-
Year Build / Design Place2011, Hyundai, Gusto P10000
-
Max. Water&Drilling Depth3.000 m - 12.000 m
-
Managed Pressure Drilling (MPD) SystemMPD-Infrastructure
Kanuni
-
Platform Type & Class6th Generation Ultra-Deepwater Drilling Platform
-
Year Build / Design Place2012, Samsung, S10000E
-
Max. Water&Drilling Depth3.000 m - 11.500 m
-
Managed Pressure Drilling (MPD) System-
Oruç Reis
-
Dimensions (Beam / Length / Height)19 m/ 83.19 m/ 33,1 m
-
Construction Date & Design2017 - İstanbul
-
Max Streamer Capacity6 streamer 8K
-
Class TypeTl +1A5 Research Vessel Fo La FS S9P54+M Aut-C Dk1
-
DP CapabilityDP-1 Kongsberg
Osman Gazi
-
Dimensions (Beam / Length / Height)29, 5 m/ 56 m/ 298,45 m
-
Construction Date and Design2008 - Singapore
-
Maximum Gas Processing Capacity10,5 million m³
-
MEG Regeneration Capacity1502 mC/day
-
Main Gas Pipeline Length161 KM
West Draco
-
Platform Type & Class7th Generation Ultra-Deepwater Drilling Platform
-
Year Build / Design Place2024, Samsung, S12000
-
Max. Water&Drilling Depth3.500 m - 12.000 m
-
Managed Pressure Drilling (MPD) SystemMPD-Installed